

Vineburg LLC
Major Subdivisions
Project Goals:
- Road Design
- Septic Design
- Pond Construction Management
- Count-Line Re-Survey
- Permit Processing
Kenwood Inn and Spa
Sewage Disposal System Renovation
Project Goals:
- Topographic Mapping
- Boundary Determination
- Planning
- Permit Processing


Hopkiln Winery
Major Subdivision
Project Goals:
- Aerial Mapping
- Administrative Certificate of Compliance
- Septic Evaluation
- Septic Design
- Vineyard Design
- Drainage System Design
- Pond, Water System Design
Warm Springs Road Bridge
Major Subdivisions
Project Goals:
- One Day Replacement of Structure
- Engineered Drawings
- Shop Drawings
- Construction Management & Coordination
- Materials ordering
- Construction Monitoring
- Foundation Observations
- Deconstruction and Removal of Old Bridge
- Special Inspections
- Traffic Control Plan
- Recycle Materials from Old Bridge
- Permit Processing


Young Property
Engineering Design and Permit Processing
Project Goals:
- Renderings
- Structural Design
- Civil, Architectural, and Electrical Designs
- Title 24 Energy Calculations
- Permit Processing
Healdsburg Commons
Major Subdivision
Project Goals:
- Major Subdivision
- Improvement Plans

MapCon
Large Scale Aerial Control Network
Project Goals:
- Aerial Photos
- Aerial Mapping and Pinpointing GPS Coordinates